Approval drawings are submitted to the design team of the project (architects, structural engineers, physicists, etc.) and contain all relevant information concerning the cladding. Elevations, sections and details show the cladding fixed to the main structure of the building. Approval drawings are also called submission,- design- or shop- drawings.